​​This project involves analysis of existing conditions to determine portions of the storm drainage system​ suitable for improvement, planning analysis of improvement alternatives, and the design and construction of the needed improvements.

The Toomey Avenue Storm Drainage Improvement Project is bordered by Toomey Avenue to the west, Baltimore Avenue to the East, Dunavant ST to the North and Chicago Avenue to the South.  This project area is within a drainage area of approximately 190 acres and the improvements may include culvert replacements, pipe system upgrades and channel improvements.
                        
Woolpert was chosen as the consultant for this project.  

Estimated Cost: To Be Determined*

*includes all costs associated with this project such as planning and design, utility relocation, consultant fees, permits, construction, and landscaping.

The project team will manage the project through several phases. Specific work is conducted during each phase and public involvement is emphasized throughout the process. Learn more about project phases.

Map

Project Team 

Harold Smith, PE
Project Manager
704-432-5532
HSmith@CharlotteNC.gov
Doug Lozner, PE
Watershed Area Manager
704-432-0964
DLozner@CharlotteNC.gov
Matthew Gustis, PE
Engineering Program Manager
704-336-6183
MGustis@CharlotteNC.gov

Documents

  
  
Toomey July 2020 Survey Mailer.pdfToomey July 2020 Survey Mailer
Toomey September 2019 Mailer.pdfToomey September 2019 Mailer