​Kings Branch Archdale to Arrowood


​Overview

Charlotte-Mecklenburg Storm Water Services will construct a floodplain and stream restoration project on approximately 6,100 linear feet of Kings Branch. The project consists of bank stabilization and vertical realignment of the channel bed, aquatic habitat improvement, and planting of native vegetation. The project has dual goals of reducing flood risk and improving water quality within the project area. FEMA Grant funding has been approved. 

Objectives:
  • Stabilize eroded stream banks
  • Restore the floodplain to its natural state and function
  • Change the stream path to a more natural design
  • Improve habitat for aquatic life
  • Enhance water quality
  • Improve stormwater control measures (SCMs) to reduce pollution

Estimated Cost: To Be Determined*

*includes all costs associated with this project such as planning and design, utility relocation, consultant fees, permits, construction, and landscaping.

Map

Please use the latest versions of Google Chrome, Mozilla Firefox, Apple Safari, or Microsoft Edge to view the map.

​Schedule

  
  
  
PlanningCOMPLETEDOctober 2021
DesignIN PROGRESSAnticipated December 2022
PermittingTBD
Property Easement/AcquisitionTBD
BidTBD
ConstructionTBD
WarrantyTBD

​Proje​ct Team

Brian G. Sikes

Project Manager