Projects

​Hastings Storm Drainage Improvement Project

Project is in the planning phase.

Project Updates

  
Update
9/23/2021

Overview

The Hastings Storm Drainage Improvement Project will reduce street and structure flooding throughout the neighborhood. Located within a drainage area of approximately 7 acres, the project will replace aging infrastructure and provide adequate system capacity.

The project area is bordered by Wellesley Avenue to the north, Hastings Drive to the south, Selwyn Avenue to the east and Jamestown Drive to the west.  Improvements may include pipe system upgrades and channel improvements.

Estimated Cost: To Be Determined*

*includes all costs associated with this project such as planning and design, utility relocation, consultant fees, permits, construction, and landscaping.

Map

Please use the latest versions of Google Chrome, Mozilla Firefox, Apple Safari, or Microsoft Edge to view the map.

​Project Team

John Keene, PE

Project Manager

Doug Lozner, PE

Senior Project Manager

Bob Jarzemsky, PE

Engineering Program Manager

​Documents

  
  
Hastings September 2021 Mailer.pdfHastings September 2021 Mailer
Hastings July 2020 Survey Mailer.pdfHastings July 2020 Survey Mailer