This project involves analysis of existing conditions to determine portions of the storm drainage system suitable for improvement, planning analysis of improvement alternatives and the design and construction of the needed improvements.

The Farmer Storm Drainage Improvement Project is bordered by West Boulevard to the north, Caronia Street to the south, Clanton Road to the east and Rose Avenue to the west. The project is within a drainage area of approximately 50 acres and the improvements may include system replacement and/or repair primarily within the Romare Bearden Drive right-of-way.   

Estimated Cost: To Be Determined*

*includes all costs associated with this project such as planning and design, utility relocation, consultant fees, permits, construction, and landscaping.

The project team will manage the project through several phases. Specific work is conducted during each phase and public involvement is emphasized throughout the process. Learn more about project phases.

Map

Project Team 

Tyler Howell, PE
Project Manager
704-336-3214
Tyler.Howell@CharlotteNC.gov
Amy Bice, EI
Watershed Area Manager
704-432-0965
ABice@CharlotteNC.gov
Matthew Gustis, PE
Engineering Program Manager
704-336-6183
MGustis@CharlotteNC.gov

Documents

  
  
There are no items to show in this view of the "Documents" document library.