Projects

​Elvis Storm Drainage Improvement Project

​Latest News

  
Update
There are no items to show in this view of the "Project updates" list.

Overview

​This project involves analysis of existing conditions to determine portions of the storm drainage system suitable for improvement, planning analysis of improvement alternatives and the design and construction of the needed improvements.​

The Elvis Storm Drainage Improvement Project is bordered by Elvis Drive to the north, Cedarbrook Drive to the west and Eastlake Road to the east.  This project is within a drainage area of approximately 640 acres and the improvements may include culvert replacements, pipe system upgrades at Cedarbrook Drive and Denbur Drive​  as well as channel improvements.  ​

Estimated Cost: To Be Determined*

*includes all costs associated with this project such as planning and design, utility relocation, consultant fees, permits, construction, and landscaping.

The project team will manage the project through several phases. Specific work is conducted during each phase and public involvement is emphasized throughout the process. Learn more about project phases.

Map

Project Team

Harold Smith, PE

Project Manager

Doug Lozner, PE

Watershed Area Manager

Matthew Gustis, PE

Engineering Program Manager

Documents

  
  
Elvis August 2019 Mailer.pdfElvis August 2019 Mailer
Elvis November 2018 Mailer survey.pdfElvis November 2018 Mailer survey