The McAlpine Farm Storm Drainage Improvement Project will reduce street and structure flooding throughout the neighborhood. Located within a drainage area of approximately 235 acres, the project will replace and/or rehabilitate aging infrastructure and provide adequate drainage system capacity. The project area is bordered by McAlpine Farm Road to the north, McAlpine Creek to the south, McAlpine Farm Road and McAlpine Creek to the east and Foxridge Road to the west.
September 2024
Charlotte-Mecklenburg Storm Water Services and engineering consultant The Isaacs Group have completed the study of the existing storm drainage system in the McAlpine Farm project area. Alternative solutions are now being developed.
*includes all costs associated with this project such as planning and design, utility relocation, consultant fees, permits, construction, and landscaping.
Learn more about project phases.
Storm Water Services
Isiah Glover, PE Project Manager 980.390.7508 Isiah.Glover@charlottenc.gov
Amy Bice, EI Senior Project Manager 704.369.9136 Amy.Bice@charlottenc.gov
September 2024 Mailer(PDF, 683KB)