May 2024
Charlotte-Mecklenburg Storm Water Services and engineering consultant LandDesign Inc. continue with the design phase. The project will replace aging infrastructure plus reduce street and structure flooding throughout the neighborhood. The project team is developing detailed drawings for the proposed improvements.