Charlotte Water is replacing service lines pipes (between pipe under the street to water meter) in the Oak Forest, Cobblestone, and Crestmont neighborhoods starting mid-July 2019 through October.

Streets include; Dunwoody Drive, Langley Road, Uppergate Lane, Strangford Avenue, Cobbleridge Drive, Densmore Drive, Winedale Lane, Donnybrook Place, Dowling Drive, Crestmont Drive, and other streets.

Key Points

  • Contractor and staff will have proper identification.
  • No contractor or staff will need to enter any home.
  • Crews will check meter inside the water meter box.
  • Customers don't need to be home.
  • If your meter box is inside a locked area or if you have large animals near the meter box, please call so we can schedule work with you.

​Project will enhance water quality and pressure.​

​Areas near construction will be notified before construction. There will be planned water outages to move customer’s service. Property owners will be notified in advance. If there is an unplanned water outage, crews will work to fix it immediately.​

​TBD

 Content Editor

​​

Frequently Asked Questions

Where does my private plumbing start?

The property owner maintains water pipe from the end of meter box (including tail piece) to building(s). The property owner is responsible for pipes and fixtures in the buildings and wastewater pipes until the edge of street or street right-of-way (varies). Charlotte Water maintains water meter up to and including the meter yoke assembly, meter box, and water and wastewater pipes under the public street.

Does my plumbing need to be replaced?

Just as pipes under the street age and have an end of service, so does plumbing in your home. Consider planning for the eventual replacement of plumbing that exceeds 50 years.

 