Hidden Valley South Neighborhood Water Main Replacement Project

Project phase

 

 Project updates

Charlotte Water is replacing water mains in the Hidden Valley neighborhood starting in August 2020 through October.


Streets include:
  1. Jarmon Court
  2. Pondella Drive (700 block)
  3. Rolling Hill Drive (4400 through 4500 blocks)
  4. Coates Court
  5. Lyles Court
  6. Paxton Court
Key Points

Project will enhance water quality and pressure.​

Areas near construction will be notified before construction. There will be planned water outages to move customer’s service. Property owners will be notified in advance. If there is an unplanned water outage, crews will work to fix it immediately.​

​TBD

Where does my private plumbing start?

The property owner maintains a water pipe from the end of the meter box (including tailpiece) to building(s). The property owner is responsible for pipes and fixtures in the buildings and wastewater pipes until the edge of the street or street right-of-way (varies). Charlotte Water maintains water meter up to and including the meter yoke assembly, meter box, and water and wastewater pipes under the public street.

Does my plumbing need to be replaced?

Just as pipes under the street age and have an end of service, so does plumbing in your home. Consider planning for the eventual replacement of plumbing that exceeds 50 years.


 

 Project contacts

An image of a Charlotte Water crew replacing old pipe in a neighborhood street with new pipe.