Projects

Davidson South Street Wastewater Improvements
Project phase

 

 Project updates

  • Charlotte Water (CLTWater) is in the design phase for a wastewater project that will ensure ongoing service for our customers in Davidson.
  • The project route begins near the Hillside Dr. and Lorimer Rd. intersection and will end near Davidson Elementary School. 
  • Updates will be posted on this site.
Schedule
  • Design Phase: Complete
  • Construction Phase: Summer 2022 – Fall 2023 

Davidson South Street Wastewater Improvements Project Map

  • The goal of this project is to use the information gathered from the planning/investigation phase to design necessary wastewater system improvements.

​During this period, it may be necessary for Charlotte Water and authorized representatives' personnel to enter upon a limited number of residential properties to access sewer manholes, perform closed-circuit television (CCTV) inspections of the existing wastewater line and conduct additional investigations as may be necessary. Their activities should not inconvenience residents in any way, and ground personnel will provide notification in advance if access to private property is required.

​To be determined.

 Activities To Expect

  • During Design Phase:
    • Surveyors
    • Small equipment
    • Flagging & stakes
    • Minor traffic control
  • During Construction Phase:
    • Staging of materials, large digging equipment & pipe installation
    • Short, momentary disruptions to service may occur, however, we will do our best to notify residents & businesses in the impacted area in advance.
    • Road closures & detours along South St., Lorimer Rd., Hillside Dr. & Cathey St.
    • Paving & site restoration after pipe installation