Bridges Provides for the timely inspection, repair and replacement of substandard bridges throughout the city.
City Facilities We plan, design and construct city-owned facilities such as fire stations, police stations and cultural facilities.
Neighborhoods Strategic investments in larger, multi-neighborhood areas to holistically address a broad array of community needs
Placemaking Using urban design and placemaking to transform underutilized public spaces into vibrant places for people.
Project Phases Learn about the various phases of a project, from advanced planning all the way to warranty and completion
Sidewalks Addressing ongoing pedestrian safety issues by constructing 10 to 12 miles of new sidewalk and 15 new pedestrian crossings each year
Storm Water Explore major Storm Water Services projects improving drainage infrastructure and surface waters.
Trails, Paths and Bike Lanes Facilities that advance the city's commitment to addressing the needs of pedestrians, bicyclists and transit users
Transportation Studies Transportation studies and evaluations to support growth and development using the multi-modal framework and foundations outlined in city-adopted plans and policies
McAlpine Creek Wastewater Management Facility McAlpine Creek Wastewater Management Facility Thermal Hydrolysis Process and Biosolids Improvements Program
Prosperity Village CNIP The Prosperity Village area is a high-growth area of the city in need of increased connectivity to regional nodes and employment centers.
Northeast Corridor Infrastructure Program (NECI) A collection of projects selected to improve pedestrian, bicyclist and motorist access to the LYNX Blue Line.
Davidson South Street Wastewater Improvements This wastewater project will ensure ongoing service for Davidson neighbors. The project route begins near Hillside Dr. and Lorimer Rd. Intersection and will end near Davidson Elementary School.
North Tryon Street Left Turn Lane at University City Boulevard Extends the existing left-turn lane on North Tryon Street to University City Blvd. by 225 feet with a 100-foot taper. Announcement : June 20, 2024 - Design is 50% complete and the project team is working toward developing 90% plans. Design is expected to be finalized in early 2025.
Mallard Creek Church Road Eastbound Right-Turn Lane Refreshes pavement markings and removes the bike lane next to the right turn lane to improve traffic flow in the area. Announcement : June 21, 2024 - Design is 100% complete and the project team is reviewing and finalizing the plans. Construction is expected to start in the spring of 2025.
Dixie Berryhill Drinking Water Project Charlotte Water (CLTWater) will extend drinking water pipes along Dixie River road from 5900 block of Dixie River Rd to Sadler Road. This website provides updates on construction progress and the project's impact on the local community.
WT Harris/Plott Road Water Main Project This project will enhance water system reliability in the area.Charlotte Water (CLTWater) will install a new water main under Plott Road and on E WT Harris Boulevard between Hickory Grove and Idlewild roads.
Water Transmission Mains Improvement and Repairs Program Charlotte Water (CLTWater) completed a Water Transmission Main assessment, which identified various improvements and repairs that are needed to optimize the function and resiliency of the existing water transmission system. This work includes several updates and repairs along several sections of water transmission main and associated distribution mains.
Little Hope Creek Wastewater Improvement Project Charlotte Water is conducting work for a wastewater replacement project that will enhance wastewater service for customers in the Little Hope Creek basin, primarily in the Sedgefield and Madison Park neighborhoods.