Cross Charlotte Trail Segment 3: 7th Street to 10th Street
- Project typeEconomic Development; Trails, Paths & Bike Lanes
- Project budget$4.2 million (includes all costs associated with the project such as planning and design, acquiring the right-of-way, utility relocation, consultant fees, construction, signalization, permits and landscaping)
- Project phaseCompleted in 2022
part of the Cross Charlotte Trail
View full-size map(PDF, 442KB)
Project Overview
This segment of the Cross Charlotte Trail will close the gap in the Little Sugar Creek Greenway at the interchange of Independence Boulevard (US-74) and the John Belk Freeway (I-277) by connecting from the current trail terminus at 7th Street to the existing trail at Greenway Crescent near 12th Street. It includes a small park with public art, including a canopied structure featuring a curved bench that gently sways in any direction. It was created by artist Matthew Geller.