West Rocky River Road Shared-Use Path

  • Project typeSidewalks, Transportation
  • Project budget$12.067 million (includes all costs associated with the project such as planning and design, acquiring the right-of-way, utility relocation, consultant fees, construction, signalization, permits and landscaping)
  • Project phaseDesign

image of the roadway showing no shoulders or sidewalk

Existing conditions

Project Overview

This project will construct a shared-use path along the north side of West Rocky River Road from Rockland Drive to Old Concord Road. The scope of the project will include 0.8 miles of a new 10-foot-wide concrete shared-use path with certain sections varying in width, an 8-foot-wide planting strip, driveway improvements, wheelchair ramps, concrete curb and gutter, and storm drainage along the north side of West Rocky River Road.

Project Goals

  • To provide safer walking and biking conditions for the citizens along West Rocky River Road
  • To connect the Orr Road to Rocky River Road West segment of the Cross Charlotte Trail that will run along Rockland Drive

Public Involvement

The project team will engage the public through in-person and virtual meetings, as well as project updates and postcards to residents in the project area.

rendering of finished project, including a shared use path and planting strip on one side of the road with two travel lanes.

Rendering of a cross-section of the street after project completion. For illustrative purposes only.

Vicinity Map

an aerial map of the project area depicting the section of roadway where the shared-use path will be by a bold yellow line