AVIA ITB 24-47 South End-Around Taxiway (SEAT)

Closing date August 14, 2024, 02:00 PM

  • Reference numberAVIA ITB 24-47
  • StatusOpen
  • SummaryBid Due Date & Time: August 14, 2024 at 2:00 PM ET

    Bid Type: Invitation to Bid

    Department: Aviation

Description

The Fourth Parallel Runway Program – South End-Around Taxiway (SEAT) project includes the construction of the South End-Around Taxiway (Taxiway P), and associated airside and landside elements in preparation for the future Runway 1C-19C. The scope of work involves, but is not limited to, pavement demolition, mass grading and excavation, hauling and placement of excess material into designated stockpiles on Airport property, stormwater drainage including large culvert construction, erosion and sediment control, new CCP taxiway pavement, new asphalt taxiway shoulder pavement, pavement markings, multiple structural elements (soil nail wall, MSE wall, visual screens, etc.), utility service relocations, airfield electrical, FAA power and communications, and FAA NAVAID improvements.

Pre-Bid Details

Date: July 2, 2024 at 11:00 a.m. ET

Location: Microsoft Teams (see link in ITB)

Instructions: Non-Mandatory

Bid Opening Instructions

Date: August 14, 2024 at 2:00 p.m. ET

Location: Microsoft Teams (see link in ITB)

Attachments

AVIA ITB 24-47 South End Around Taxiway (SEAT)(PDF, 2MB)

 

All ITB activity to take place through the e-Builder portal (see under "Related Information" on right-side for link)