Description
This project is part of the 4th Parallel Runway Program and includes the construction of Runway 1C-19C and associated connectors (also referred to herein as “taxiways”). The scope of work involves, but is not limited to clearing, pavement demolition, CCP pavement, asphalt shoulder paving, NAVAID access road installation, excavation, hauling and placement of excess material into designated stockpiles on airport property, stormwater drainage, erosion and sediment control, pavement markings, RTR site demolition and construction of two new RTRs and associated utilities, airfield electrical, FAA power and communications, and FAA NAVAID relocations.
Pre-Bid Details
Date: September 17, 2024 at 2:00 p.m. ET
Location: Microsoft Teams (see link in ITB)
Instructions: Non-Mandatory
Bid Opening Instructions
Date: October 22, 2024 at 2:00 p.m. ET
Location: Microsoft Teams (see link in ITB)
Attachments
AVIA ITB 25-11 4PR Bid Package 2 RWY 1C-19C(PDF, 2MB)
AVIA ITB 25-11 Bid Tabulation(PDF, 111KB)
All ITB activity to take place through the e-Builder portal (see under "Related Information" on right-side for link)