Description
The project proposes to add sidewalks and bike lanes by widening parts of J.W. Clay Boulevard. Sidewalks are currently in place in some stretches of this street; however, they will be upgraded to wider 8-foot sidewalks. The roadway and median width will be adjusted to allow for the addition of bike lanes. The conceptual cross-section includes four travel lanes with four left-turn lanes at intersections, a 12-foot cycle track, a 10-foot multiuse path, curb & gutter, 8-foot sidewalk & planting strip and street trees. The project will include connectivity to the Barton Creek Greenway interface with J.W. Clay Boulevard. The project also includes the intersection of W.T. Harris Boulevard, J.W. Clay Boulevard, and McCullough Drive and will provide a safe pedestrian and bicycle crossing at the intersection. The project will, among other things, tie the J.W. Clay Boulevard Streetscape project into the McCullough Drive Streetscape project.
Pre-Bid Details
Date: Nov. 9, 2023 at 10:30 a.m. EST
Location: Microsoft Teams (join here)
Bid Opening Instructions
Due Dec. 20, 2023, at 2:30 p.m. EST on the Bonfire Portal. A virtual bid opening will be held the same day at 3 p.m. EST via Microsoft Teams (join here)
Attachments
Advertisement for JW Clay Blvd Streetscape(PDF, 292KB)
Bonfire instructions(PDF, 115KB)
Addendum 1 - Changes to the project manual (10/31/2023)(PDF, 297KB)
Addendum 2 - Change to bid due date (11/14/2023)(PDF, 260KB)
Addendum 3 - Changes to project manual (11/21/2023)(PDF, 214KB)
Addendum - Re-advertisement(PDF, 445KB)