I-85 North Bridge (Re-Bid)

Closed December 20, 2023, 01:00 PM

  • Reference number269-2024-023
  • StatusComplete
  • SummaryBid Due Date & Time: Dec. 20, 2023 at 1 p.m. EST

    Bid Type: Invitation to Bid

    Department: General Services

Description

This project will connect Doug Mayes Place and Research Drive. This scope includes two bridges, one over I-85 and the other over Doby Creek. The bridge over I-85 will include aesthetic elements to create a gateway into Charlotte. In addition, the project will realign the intersection of Research Drive and David Taylor Drive to provide more efficient travel through the intersection. The construction work includes grading, paving, storm drainage, bridge structures, curb & gutter, sidewalk, driveways, curb ramps, erosion control, traffic control, pavement marking, guardrail, aesthetic lighting and related works.

Pre-Bid Details

Date: Dec. 7, 2023 at 10 a.m. EST

Location: Via Microsoft Teams.

Bid Opening Instructions

Bid submissions are due in Bonfire by 1 p.m. EST on Dec. 20, 2023. The bid opening results meeting will be held at 1 p.m. EST the same day. See advertisement(PDF, 436KB)  for details.

Additional Instructions

For questions, please use the vendor discussion feature in Bonfire for the project.

Attachments

City of Charlotte inclusive Bonfire instructions(PDF, 116KB)

Advertisement(PDF, 324KB)

Plan holders as of Nov. 14, 2023(PDF, 81KB)

Addendum 3 - Modifications to project manual(PDF, 436KB)