Description
This project includes the extension of the existing basement refrigeration condenser water loop. The awarded contractor shall be responsible for the installation of a 2” refrigeration condenser water loop main extension from the basement level of the main terminal to a tie-in point on the ramp level baggage handling room. The awarded contractor shall be responsible for coordinating condenser water pipe routing with the Terminal Lobby Expansion contractor prior to construction. In addition, the awarded contractor shall coordinate existing condenser water system shutdown(s) as needed to complete the system tie-in.
Site Visit (Non-Mandatory)
Date: June 6, 2023 at 10:00 AM
Location: Meet at CLT Center, 5601 Wilkinson Blvd., Charlotte, NC 28208
Instructions: You MUST pre-register if you plan to attend. See ITB for details.
All bidding activity performed through e-Builder e-bidding portal. To access, click here.