| |  | 10/13/2022 2:00 PM | | 2027 | 9/29/2022 2:00 PM | | Construction | The project involves analysis of existing conditions to determine areas suitable for improvement, planning analysis of improvement alternatives, and the design and construction of the needed improvements in the Bonwood Storm Drainage Improvement Project (SDIP) area.
The Bonwood SDIP is bordered by Wendover Road to the south, Canterbury Drive to the east and Chadsford Place to the west. This project is within a drainage area of approximately 124 acres and the improvements include paving, curb and gutter, culvert replacements, pipe system lining/repair and upgrades, and minor open channel improvements. | FY23-ITBCon-15 | | Invitation to Bid | Bonwood Storm Drainage Improvement Project | Bidding documents, which includes a printed copy of one (1) Project Manual and one (1) full-size Drawing set, are available for a non-refundable charge of $74.00 (including tax) at the following: Richa Graphics orders@richa.com704-331-9744 South End – 231 E. Tremont Ave., Charlotte, NC20203; and North End – 800 N. College St., Charlotte, NC 28206 Online – http://planroom.richa.com | Charlotte-Mecklenburg Storm Water Services, Charlotte Water, General Services (previously Engineering) | |