| |  | 11/20/2020 10:00 AM | Submit to: City of Charlotte Property & Maintenance (Building Services) Department 531 Spratt St, Charlotte, NC 28206
Bid Opening: Nov 20, 2020 at 11 AM via WebEx | 1520 | | N/A | Construction | The project includes implementation of a two‐way separated cycle track in Uptown Charlotte along portions of 5th and 6th Streets. It will provide a connection between Little Sugar and Irwin Creek Greenways. The cycle track will be constructed mostly within the existing roadway, currently used as vehicular travel lanes and on‐street parking. Traffic signals will be modified and an at‐grade crossing of the Lynx Blue Line is required. Work includes the construction of cycle tracks and ramps, concrete medians, pavement markings, milling, resurfacing, traffic signals and signage.
| PMES181550 | | Invitation to Bid | Uptown Cycle Track (RE-BID) | | General Services (previously Engineering) | |