| |  | 9/3/2020 2:00 PM | Submit to: City of Charlotte Property & Maintenance (Building Services) Department 531 Spratt St, Charlotte, NC 28206
Bid Opening: August 27, 2020 at 3:00 PM WebEx Only | 1438 | 8/4/2020 11:00 AM | WebEx Only | Construction | The Project is located in the Beverly Woods area between Park Road to the west, Sulkirk Rd. to the north, and Sharon road to the south and east. The purpose of the project is to reduce structural and roadway flooding. Improvements include culvert replacements and pipe system upgrades. Work includes: Removal of existing storm drainage and installation of new reinforced concrete pipe, reinforced concrete box culverts, catch basins, junction boxes and headwalls; channel bank enhancement and stabilization; foundation protection; removal and replacement of valley gutter, driveways and pavement; water and sewer relocations; traffic control, grading, and other related activities. | 671‐13‐015 | | Invitation to Bid | Chandworth Storm Drainage Improvement Project | | General Services (previously Engineering) | |