R​obinhood/Dooley Storm Drainage Improvement Project​​

​La​test News

  
Update
There are no items to show in this view of the "Project updates" list.

Over​view

The Robinhood/Dooley Storm Drainage Improvement Project will reduce street and structure flooding throughout the neighborhood and address stream erosion to provide a more natural, stable stream system. The project is located within a drainage area of approximately 440 acres.

Estimated Cost: $7.1 Million​

*includes all costs associated with this project such as planning and design, utility relocation, consultant fees, permits, construction, and landscaping.

The project team will manage the project through several phases. Specific work is conducted during each phase and general descriptions with timeframes are below. Public involvement is emphasized throughout the process.

Map

​S​chedule

  
  
  
PlanningCOMPLETEDJune 2010
DesignCOMPLETEDJune 2012
PermittingCOMPLETEDMarch 2012
Property Easement/AcquisitionCOMPLETEDMay 2012
BidCOMPLETEDOctober 2012
ConstructionCOMPLETEDDecember 2015
WarrantyIN PROGRESS

​Projec​t Team  

Cody Smith
Construction Supervisor
704-564-7028
pcsmith@charlottenc.gov
 
Matthew Anderson, P.E.
Project Manager
704-336-7923
manderson@charlottenc.gov

​​Multimedia

​Doc​uments

  
  
Robinhood June 2015 Mailer.pdfRobinhood June 2015 Mailer
Robinhood October 2014 Mailer.pdfRobinhood October 2014 Mailer
Robinhood June 2014 Mailer.pdfRobinhood June 2014 Mailer
Robinhood February 2014 Mailer.pdfRobinhood February 2014 Mailer
Robinhood October 2013 Mailer.pdfRobinhood October 2013 Mailer
Robinhood February 2013 Mailer.pdfRobinhood February 2013 Mailer
Robinhood October 2012 Mailer.pdfRobinhood October 2012 Mailer
Robinhood June 2012 Mailer.pdfRobinhood June 2012 Mailer
Robinhood October 2011 Mailer.pdfRobinhood October 2011 Mailer
Robinhood June 2011 Mailer.pdfRobinhood June 2011 Mailer
Robinhood May 2011 Mailer.pdfRobinhood May 2011 Mailer
Robinhood November 2010 Mailer.pdfRobinhood November 2010 Mailer
Robinhood July 2010 Mailer.pdfRobinhood July 2010 Mailer
Robinhood June 10 2010 Mailer.pdfRobinhood June 10 2010 Mailer
Robinhood June 3 2010 Mailer.pdfRobinhood June 3 2010 Mailer
Robinhood March 31 2010 Mailer.pdfRobinhood March 31 2010 Mailer

​​​​​​​​​​​​​​​​​Project Phases  

​​Planning
Survey crews document the existing drainage system and surrounding areas. The project team uses this information, along with property owner input and requests for service, to analyze existing drainage system conditions. Staff hosts a public meeting to present the existing conditions analysis and obtain additional input from property owners. Several improvement alternatives are then developed and evaluated to determine the most economical and least impactful solution. The project team presents the recommended alternative to property owners for input at a public meeting at the end of this phase. This phase typically lasts 12 to 27 months.

Design
The project team develops detailed construction drawings for the selected alternative, addressing pipe sizes and alignments, drainage channel widths, utility relocations and easement locations. A project team member may meet with individual property owners to discuss the drainage system improvements and how construction will impact specific properties. The project team hosts a public meeting to present the preliminary design plan, which illustrates specific improvements to properties, and begin the easement acquisition process. This phase typically lasts 21 to 34 months.

​Permitting
The project team obtains required Federal and State water quality permits and other necessary permits, such as permission to work within railroad and NCDOT rights-of-way, as necessary. This phase typically lasts 3 to 9 months and will overlap with the Design Phase.

Property Easement/Acquisition
Staff works with property owners to acquire ​​temporary or permanent easements. Easements provide permission for Storm Water Services to access the property, construct the recommended improvement and provide future maintenance. This phase typically lasts 9 to 12 months and will overlap with the Design Phase.

Bid
A competitive bidding process is held to select a qualified contractor to construct the project. By state law, the lowest responsible bidder is awarded the construction contract. This phase typically lasts 7 to 8 months.

Construction
Throughout construction, the project team works to minimize disruption to property owners. The Storm Water Services construction inspector serves as the main point of contact for residents. Notifications of key construction dates will be communicated to residents prior to construction.  This phase varies, depending on the specific project, but typically lasts up to two years.

Warranty
The construction contract includes a warranty guaranteeing materials and workmanship for one year from the date of completion. The construction inspector conducts 6- and 11-month inspections during the warranty period. Upon notification, the contractor must repair defective items at no additional cost.