This project will close the connection of Sweetbriar Street at The Plaza. The existing sidewalk and curb and gutter along The Plaza will be extended across Sweetbriar Street. Construction is expected to occur in March 2017.

To enhance pedestrian and motorist safety

​Residents living near this area launched a petition in December 2015 to close the connection. The petition was returned in March 2016 with well over the 60 percent of residents' signatures required to approve it. The City mailed postcards to residents during a 30-day appeal period and no feedback was received, allowing the project to move forward. 

$35,000

​​​Please note this is the funding amount and includes all costs associated with the project such as planning and design, acquiring the right of way, utility relocation, consultant fees, construction, signalization, permits and landscaping.