​This sidewalk project will connect existing sidewalk along both sides of Little Rock Road, making continuous sidewalks (3/4 mile) between Tuckaseegee Road and Robert L. Smith Park. Pedestrian improvements at the Little Rock Road/Tuckaseegee Road signalized intersection will also be included as part of this project, which is scheduled to be complete by the end of September 2019.
  • ​​To have continuous sidewalk between Tuckaseegee Road and Robert L. Smith Park on at least one side of Little Rock Road

  • To implement a new sidewalk that will provide safer walking conditions for the residents and students in this area

  • To connect a missing gap of sidewalk between Tuckaseegee​ Elementary School and Robert L. Smith Park

​Public meetings were held on March 5, 2015 and May 24, 2016 to get feedback from residents on the proposed project.​

​$​1.45 million

​​​Please note this is the funding amount and includes all costs associated with the project such as planning and design, acquiring the right of way, utility relocation, consultant fees, construction, signalization, permits and landscaping.